Get your geothermal system up and running - and keep it operating efficiently.
After checking the ground heat exchanger for tightness, installers should follow these testing steps.
Most manufacturers publish performance ratings on their various models, including loop certifications.
After installation, flushing and testing - and prior to operation - the geothermal heat pump system should be evaluated using a checkout procedure.
These periodic maintenance procedures should be performed at regular intervals.